Chuck's Kitchen

Day one: The cabinets as they appeared when we arrived. This is the left side of an "L" shaped kitchen.
This is the right side  
This is the opposing wall
 Customer has new granite tops, wall splash & flooring. We cover everything with moving blankets.
 We remove all the doors & drawer fronts.
 By the end of day one, some lamination has begun.
By the end of day two the upper cabinets, and some lower ones, are laminated, and a new pantry has been installed on the opposing wall.
The doors and some hardware are installed by the end of day three.
Day four we finish up as the moldings, the baseboard, and the remaining fronts and hardware are installed.

Ginnie's Kitchen